On Site – Logistics – Installation

Copart Project Details

With over 8000 vehicles on site, COPART required a new compound for storage. After working together to identify requirements.

With over 8000 vehicles on site, Copart required a new compound for storage. After working together to identify requirements, HERMEQ supplied over 800m of Galvanised Palisade to meet their needs.

Copart’s location now has improved health & safety standards, tighter security for the car storage and enhanced logistics for their on-site staff.

Impressed with the results upon project completion, Copart put the wheels in motion for future work with HERMEQ. A 27.5m installation of 1.8m Palisade PC Blue in Full Sutton Industrial, Estate, York is next.

COPART are one of the biggest car salvage yards and used car dealers in the UK with over 8000 unique vehicles on-site, in multiple yards/locations. Health & Safety as well as the effective protection of assets on-site was crucial for both HERMEQ and our client.

After thorough project planning in collaboration with the COPART management team, we identified several pain points we needed to consider during the installation.

This arboriculture work on-site included the removal of trees and other organic materials from site before planned works could commence.

COPART operate a lively working site with over 8000 used or salvaged cars being stored, moved and sold during our planned installation. Health and safety of both our staff and COPART’s had to be our #1 consideration, with proper planning we recorded 0 accidents/incidents during the full installation.

After identifying the need for removal of arboriculture from COPART’s site we had to plan the distribution of required materials both on and off-site effectively, to ensure minimal downtime and an efficient spend of both Staff and Client time.

  • CLIENT: COPART
  • PROJECT TYPE: 801m of Palisade Fencing Installation

  • DATE: 28/04/2020
  • CONTRACTOR: HERMEQ On-Site

Events – Fencing – Traffic

Client Case Studies

Examples of how HERMEQ On-Site provide exceptional solutions for our clients.

Countryside needed a suitable and sturdy barrier for day-to-day use On-Site to demarcate vehicle lanes and pedestrian walkways.

Pentadel required an entirely closed construction site & the installation of specific gate systems to ensure easy access to site during planned works.

PP O’Connor delivers a full construction service from concept to completion & required an off-road barrier to secure a demolition site.

Passionate – Dedicated – Professional

Send your query or request a callback

Fill out this form and a member of our team will be in contact with you as soon as possible.