On Site – Logistics – Installation

Countryside Project Details

Countryside needed a suitable and sturdy barrier for day-to-day use On-Site to demarcate vehicle lanes and pedestrian walkways.

The completion to a high level despite environmental challenges the demarcation of all site entrances, walkways and work areas at Dayrell Road, Northampton.

Impressed with the results and ingenuity displayed by our on-site team Countryside have decided to go ahead with another 2km of Buddha Barriers on a second site in Hereford.

The majority of this project was completed using HERMEQ Anti-Trip Water Filled Separator, also known as the Buddha Barrier, is the first of its kind on the market in the UK. This revolutionary traffic management product takes all of the pro’s from other water filled barriers currently on the market and blends them into one unique product.

These anti-trip road separators will stand up when empty, adding water increases the capacity to 27.2kg. At 800mm in height, it creates a safer environment for pedestrians over traditional Water Filled Separators that are normally 500mm high, as well as this, the HERMEQ Anti-Trip Water Filled Separator can be fitted with a metal fence panel that creates a barrier over 1.8m in height.

Countryside is the UK’s leading mixed-tenure developer specialising in building communities and homes throughout the UK. Countryside were faced with a challenge. They needed a suitable and sturdy barrier for day-to-day use On-Site to demarcate vehicle lanes and pedestrian walkways.

HERMEQ offer a range of Water Filled barriers which are lightweight when they are moved into position, making installation easy. Once they are filled they become heavy, meaning they can withstand wind loading and act as a durable demarcation barrier. We also recognised that as the barriers were being used to highlight pedestrian walkways and vehicle routes, they needed to be high visibility. Therefore, we installed our red and white Buddha Barriers with chapter 8 compliant red and white reflective strips on them.

After HERMEQ first visited the planned works site at Countryside we instantly realised our challenge would be erecting an effective structure on such uneven ground. The team at Safe Fence then came up with a solution to layout the barriers top & tail to provide a more rigid structure, then putting the Buddha Barriers all facing the same way around. This out-of-the-box thinking meant HERMEQ still provided Countryside with exactly what they wanted whilst delivering a high quality of work.

  • CLIENT: Countryside Homes
  • PROJECT TYPE: Demarcation of site entrances, walkways and work areas.

  • DATE: 21/04/2020

  • CONTRACTOR: HERMEQ On-Site

Events – Fencing – Traffic

Client Case Studies

Examples of how HERMEQ On-Site provide exceptional solutions for our clients.

PP O’Connor delivers a full construction service from concept to completion & required an off-road barrier to secure a demolition site.

Pentadel required an entirely closed construction site & the installation of specific gate systems to ensure easy access to site during planned works.

With over 8000 vehicles on site, COPART required a new compound for storage. After working together to identify requirements.

Passionate – Dedicated – Professional