On Site – Logistics – Installation

Pentadel Project Details

Pentadel required an entirely closed construction site & the installation of specific gate systems

Pentadel Project Management design and deliver modern and innovative industrial facilities for businesses and brands in both the UK and around the world. HERMEQ were called to install a 315m perimeter fence built out of In-Ground Steelwall Hoarding around a construction site. One of the main challenges of this project was ensuring the safety and security of the site.

HERMEQ had to ensure that the fence line had to have no gaps, this was done in order to prevent visibility to the public and reduce ease of access to potential trespassers.

With the security of the site being a top priority for Pentadel, HERMEQ meticulously planned the project specifications to properly ensure total, visual coverage of the site to ensure no visibility for pedestrians and reducing the risk of trespassing. To do this required specialised tools and materials to work with on-site, which is why Safe Fence chose In-Ground SteelWall Hoarding to meet the client’s needs.

Operating and functioning to full efficiency in an entirely closed construction site required the installation of specific gates. HERMEQ fitted a 6m Vehicle & Pedestrian Gate – this ensured that despite the heightened security measures taken with the hoarding construction, they still allowed protected access for the Pentadel team at the correct points of the site. HERMEQ fitted a 6m Vehicle & Pedestrian Gate.

  • CLIENT: Pentadel

  • PROJECT TYPE: 315m installation of steel wall hoarding & access
  • DATE: 08/04/2021

  • CONTRACTOR: HERMEQ On-Site

With strict security and safety requirements on site, HERMEQ delivered a complete 315m fencing ring on-time and within budget around the proposed Pentadel construction site.

Having fulfilled and exceeded all requirements from the client regarding limiting pedestrian visual access and ensuring that the construction site could function at optimum efficiency by allowing the movement of materials & personnel on and off-site via the vehicle and pedestrian Vehicle Gate installed on-site.

Events – Fencing – Traffic

Client Case Studies

Examples of how HERMEQ On-Site provide exceptional solutions for our clients.

Countryside needed a suitable and sturdy barrier for day-to-day use On-Site to demarcate vehicle lanes and pedestrian walkways.

PP O’Connor delivers a full construction service from concept to completion & required an off-road barrier to secure a demolition site.

With over 8000 vehicles on site, COPART required a new compound for storage. After working together to identify requirements.